PROJECTS

PT Semen Indonesia Logistik
PT Petrosea, Tbk

This project involved the supply of mechanical and civil materials from May to August 2023. The scope of work included the provision of various materials such as pipes, bolts, nuts, rings, turnbuckles, and civil materials like Fosroc products and anchor bolts. The total agreed project value was Rp 651,003,999.

  • Office Stationery and Mechanical Tools: A one-time delivery in May 2023 valued at Rp 54,094,500.

  • Blackwater Services: Provided from May to December 2023, totaling Rp 420,151,500.

  • Drinking Water Supply: Delivered from May to December 2023, amounting to Rp 382,889,500.

  • Fresh Water Supply: Delivered from May to December 2023, with a total value of Rp 189,000,000.

2023
PT Bahtera Niaga International
  • PT Bahtera Niaga International successfully fabricated a versatile oil spill boom for an offshore vessel at Lamongan Shorebase in July 2023. Valued at Rp 70,000,000, this project delivered a piece of equipment essential for various on-board operations.

  • This project involved the supply of engine running store equipment in January 2025, with a total project value of Rp 11.409.157,-

2024
PT Adhikarya Site Sumbawa Project

PT Adhi Karya Site Sumbawa Project involves the supply of civil materials for the PPDU gate. This project is scheduled for execution in January 2024 and has a total project value of Rp 364,140,000.

PT Petrosea, Tbk
  • Supply mechanical welding rod materials, office stationery, Civil materials semen, sikagrout, fosroc : A one-time delivery in January to May 2024 valued at Rp 834.767.542,-

  • Blackwater Services: Provided from January to August 2024, totaling Rp 3.333.450.000,-

  • Drinking Water Supply: Delivered from January to August 2024, amounting to Rp 1.027.260.750,-

  • Fresh Water Supply: Delivered from January to August 2024, with a total value of Rp 1.141.200.000,-

Dinas Pekerjaan Umum dan Tata Ruang Gresik Distric

The project involves the supply of mechanical tools for Dinas Pekerjaan Umum dan Tata Ruang Gresik Distric. The tools will be delivered in August and September 2024, with a total project value of Rp 58,225,225.

PT Freeport Indonesia
  • Fabrication and supply of safety curtain materials for PT Freeport Indonesia, sulphuric acid area, hydrogen peroxide area, and chute area in Septermber 2024 with a total project value Rp 233.307.840,-

  • Fabrication and supply of safety curtain materials for PT Freeport Indonesia, reagent/ argon HUT area in November 2024 with a total project value Rp 17.680.000,-

PT Thai Union Kharisma Lestari
  • Maintenance building tub control truck scale 2 - Mill Tower 1 PT. Thai Union Kharisma Lestari in January 2025, with a total project value of Rp 8.160.000,-

  • Maintenance building installation valve hdpe 3 spot PT Thai Union Kharisma Lestari in January 2025, with a total project value of Rp 6.650.000,-

Inlet chute installation - 3A Factory PT Petrokimia Gresik in February 2025, with a total project value of Rp 35.528.000,-

PT Petrokimia Gresik
PT Petrosea, Tbk
  • Extend Blackwater Service: Provided start from January 2025, totaling Rp 570.984.000,-

  • Supply Construction and SHE Materials: A one-time delivery in January 2025 valued at Rp 12,554,100,-

2025